AMEX Phase 1 & 2

This project involved a comprehensive three-floor fit-out in a high-traffic, centrally located building in London.  The complexity of this project was heightened by the fact that the rest of the building remained occupied by a prominent blue-chip client throughout the renovation.  The temporary services put in place were essential to maintaining safety, minimising disruption and ensuring that both eh ongoing git-out and the business activities of other building occupants proceeded smoothly.

Key Site Temporary Services included:-

  • Isolated Power Distribution & Electrical Safety
  • Dust Control & Air Quality Management
  • Soundproofing & Noise Management
  • Temporary Welfare Facilities
  • Temporary Lighting & Signage
  • Safety & Security Protocols
  • Waste Management & Recycling
  • Environmental Controls & Comfort – ventilation control, lighting & energy conservation measures

This fit-out required a meticulously planned set of temporary services to accommodation construction needs while respecting the operational requirements of a blue-chip client in the same buildings.  Through careful isolation of power and ventilation, stringent safety protocols and noise and waste management strategies, the project was able to proceed with minimal disruption to building occupants.  These temporary best practices in urban fit-outs where operational continuity and tenant satisfaction are paramount.

Read More