20 Ropemaker Street
A 25-storey mixed-use commercial scheme worth £240m.
The project included the creation of a double-height entrance and lobby along Ropemaker Street close to Moorgate Tube Station and a separate dedicated cycle entrance. A single storey business space is located at mezzanine level within the “street block”. Occupiable office space covers 22 floors, with five accessible roof terraces. Three basement levels are provided for retail servicing, plant, facilities management, cycle and shower facilities.
Arc Waterproofing were responsible for:
- Provision of all information in relation to achieving a BREEAM rating of Outstanding
- Drainage matting
- Insulation
- Removal of existing paving and installation of new
- Tree pit surface finishing
- Drainage channels
- Installation of all landscaping fixtures & fittings