Warwick Court

Arc Waterproofing were involved in the major refurbishment of Warwick Court transforming the dated commercial premises into 180,000 sqft of prime office space. The redevelopment substantially upgrades the existing eight-storey building. Through comprehensive refurbishment and targeted interventions, which included a full reconfiguration of the ground floor, the scheme extends the operational life of this 18-year-old building and transforms it to meet today’s expectations for flexible and adaptable office spaces.

With a focus on wellness central to the redevelopment’s ethos, the scheme improves access to the new cycle and shower facilities on the lower ground floor and basement levels. Designed to maximise the uptake of active travel methods, the proposals provide 210 cycle spaces along with ample changing facilities. In a further boost to wellness, 

Warwick Court’s occupants will benefit from increased external amenity space, with two high quality terraces at levels six and eight offering expansive views of St Paul’s Cathedral. Coupled with the upgrade of the existing external spaces at levels four and five, the building will now offer 6,000 sqft of outside amenity space.

Originally designed for a single tenant, the building has now been remodelled to welcome multiple occupiers, with shell and core upgrades incorporating new MEP systems and enhanced on-floor WC provision throughout. The ground floor through to the fifth floor will be fitted out to Cat A, with subdivisions allowing joint tenancies on each floor.

Our works included the provision of new terraces at Level 6 of the roof areas, refurbishment of terraces at levels 4&5, partial infill to the internal atrium and waterproofing of all areas.

Read More